EVO StructuresGet in Touch →
Completed structural beam remediation
Structural Modifications

Structural Beam
Remediation

Correcting an undersized, deflecting beam system with substantial glulam members and engineered custom-fabricated connections.

The Challenge

When structure
starts to move.

The existing patio roof was supported by 6×10 pine beams connected with lag screws. Under the weight of the concrete roof tiles above, the beams were visibly deflecting and twisting.

This was not a cosmetic repair. The roof structure had to be carefully supported and stabilized before the compromised beam system could be removed and replaced.

01 / Stabilization

Support the load
before changing it.

Temporary walls, diagonal bracing, shoring posts, and lifting equipment created a controlled support system around the existing roof. This allowed the structural work to proceed while maintaining support for the assembly above.

Temporary shoring and bracing supporting the roof
02 / The Remediation

A carefully controlled
structural sequence.

Existing beams exposed during remediation
Existing beam system exposed while temporary support carries the roof.
Temporary shoring below existing beam
Shoring and bracing maintain stability while structural members are addressed.
Multiple shoring posts and temporary framing
A coordinated temporary support system provides access to the structural work while controlling the load above.
Completed glulam beam structural replacement
03 / The Structural Solution

More capacity.
Better connections.

The original 6×10 pine beams were replaced with substantially larger 8½×15 glulam members. The new beam system is paired with engineered, custom-fabricated steel hardware designed for the structural connections.

The solution addresses the underlying structural problem while preserving the open character of the covered outdoor space.

04 / Connection Details

Engineering becomes
part of the architecture.

The steel hardware is functional first, but its exposed placement also makes the structural logic legible. Clean fabrication and deliberate detailing allow the connections to feel integrated with the finished structure.

Custom fabricated steel beam connectionEngineered steel connection at glulam beam
Finished structural beam remediation
The Finished Result

Corrected structure.
Intentional finish.

A structural repair should solve the problem first — and still belong to the architecture when the work is complete.